Joining the two roof lines

Window openings still covered with wrapping paper

The wall with the window must come down to open up the kitchen area.

The Project Manager is smiling, and that is a GOOD thing!

Soffits going up

From the causeway - roof now completed

New snow on the mountains - lovely setting for a Marine Search and Rescue Centre!

Doors and windows in!

The front door.

The BBQ is on the new dock

West side has a small porch.

The old dock has become the working dock, now that the new one is in place on the S. side. Mapleguard will be moved back eventually.


The kitchen with windows looking out the N. side

Lots of windows (NW view)

The view out the kitchen window (unfortunately, the camera focused on the screen)

Still a nice view of lovely homes ...

More windows. No shortage of light!

Storage areas, looking through the kitchen over the serving wall. The head is between the two storage rooms, to the right of the fridge.

Insulation has arrived.

R12 for the walls, R28 for the ceiling.

Alvin and Roz installing the wall insulation first. George still fiddling with the wiring.

Preparing the kitchen area to receive cupboards.

Front door still needs a lock set ...

Lorne unloading more material from the barge around the corner. Dianne Eddy, Don Manness and Alvin Meldrum supervising...

Coxswain Lorne Erickson expertly landing the Mapleguard back in her mooring bay next to the Lighthouse Country Marine Centre.
Wainscotting and end wall going in ...

The kitchen (galley?) taking shape under the tutelage of Jack Ryvers and Gerry Caillé

A closer view of some of the wainscotting

Another view of the end (west) wall and ceiling.

Dec. 23, 2009

2009.12.23-1

2009.12.23-2

Ceiling with lights installed. Dec. 23, 2009. Nice state to leave the building for Christmas Holidays!